Treating grout as waterproofing
Grout is not a water barrier. The membrane behind the tile keeps water out of the wall.
Service · Bathrooms
Bathroom remodels planned around waterproofing, layout and the trades behind the walls

A bathroom brings several trades into one small room. We plan the layout and sequence before demolition, put waterproofing behind tile in wet areas, and coordinate the work so each step is ready for the next.
Depends on the scope, the condition behind the walls, material lead times and any permit or inspection steps. Your written contract sets the actual schedule.
Avoid these
Things worth watching for on any job, ours or someone else's.
Grout is not a water barrier. The membrane behind the tile keeps water out of the wall.
Waiting to pick tile, fixtures and the vanity can stall a job. Selections made early keep the schedule steady.
Without a working exhaust fan, moisture lingers and finishes suffer. Check it during planning.
On site
Walk the room, confirm layout, selections and what needs a permit.
Remove old finishes, check what is behind them, and prepare the substrate.
Waterproofing, tile, drywall, paint and fixtures in the right order.
Final walkthrough and punch list with you.
What good looks like
A few photos from the trade, with what to look for in each one.



Photos
7 photos shown
Call (206) 550-4576 or send an estimate request.