Service · Siding

Exterior siding

Siding details that keep water out in the Pacific Northwest

Two-story house exterior with tan lap siding on the lower floor and dark siding above, seen behind a white picket fence.

In Seattle, siding has to keep shedding rain through wet winters. How the wall is flashed and wrapped matters as much as the boards you see. We install siding over a weather-resistive barrier with flashing at openings, and follow the manufacturer's installation instructions for the product you choose.

Typical timeline

Typically 1–4 weeks, depending on how many walls, how much repair is needed, and the weather. Your written contract sets the actual schedule.

Materials

  • Fiber cement, engineered wood, or vinyl siding
  • House wrap and, where specified, rain-screen furring
  • Flashing, trim, and corner systems

Avoid these

Common mistakes on this trade

Things worth watching for on any job, ours or someone else's.

01

Skipping moisture management

In our climate, the weather barrier, flashing and drainage gap behind the siding do much of the work. Leaving them out is a common reason walls rot.

02

Covering damaged sheathing

New siding over soft or wet sheathing hides a problem that gets more expensive. We check for it when old siding comes off.

03

Wrong fasteners or flashing

Fastener type and spacing, and flashing at windows, doors and penetrations, are set by the manufacturer. Following them helps the wall perform as intended.

On site

How we typically work

  1. Step 01

    Evaluate

    Look at existing siding, sheathing and moisture points before writing a scope.

  2. Step 02

    Protect

    House wrap and flashing go on first, the part nobody sees but everybody depends on.

  3. Step 03

    Install

    Boards cut, aligned and fastened for a consistent reveal.

  4. Step 04

    Finish

    Corners, window trim and transitions finished and cleaned up.

What good looks like

Finished siding — details worth noticing

A few photos from the trade, with what to look for in each one.

Side wall of a house with bare plywood sheathing and two extension ladders leaning against it.
Bare sheathing and ladders
House wall with white house wrap above three windows and new beige lap siding below, with scaffolding in the foreground.
House wrap with lap siding going on
Blue lap siding around white doors on the left and a wall covered in yellow house wrap on the right, with tools and a ladder on the ground.
Blue lap siding beside house wrap

Photos

Siding: photos from job sites

7 photos shown

Thinking about siding?

Call (206) 550-4576 or send an estimate request.