Service · Paint

Interior and exterior paint

Painting where preparation does most of the work

A paint job is only as good as the prep under it. We clean, sand, patch and prime to suit the surface, then cut in the edges by hand. Exterior work is scheduled around Seattle's dry spells so coatings can cure.

Typical timeline

Typically 2–7 days, depending on the number of rooms or exterior walls and the weather. Your written contract sets the actual schedule.

Materials

  • Primers matched to the surface and existing coatings
  • Interior and exterior paints
  • Caulk, patching compound and masking

Avoid these

Common mistakes on this trade

Things worth watching for on any job, ours or someone else's.

01

Skipping prep

Cleaning, sanding, patching and priming take most of the effort, and they are what makes a finish last.

02

Wrong primer

New drywall, oil-painted surfaces and bare wood need different primers. The wrong one can lead to peeling.

03

Fighting the weather

Exterior paint needs the right temperature and dry conditions. We plan around Seattle's weather, not only the calendar.

On site

How we typically work

  1. Step 01

    Prep

    Clean, sand, patch and mask.

  2. Step 02

    Prime

    Use a primer matched to the surface and any previous coating.

  3. Step 03

    Cut in and roll

    Edges cut by hand; fields rolled or sprayed for even coverage.

  4. Step 04

    Second coat and walkthrough

    Second coat, touch-ups, cleanup and a walkthrough with you.

Photos

Project photos

We have not published photos for this trade yet. Ask us about recent paint work when you request an estimate.

Thinking about paint?

Call (206) 550-4576 or send an estimate request.